Advice

General Maintenance
How to keep your trailer in top condition.
Safety Checks Before Travel
It is your responsibility to ensure that it safe to travel.
Electrics
Information regarding the electrics used for your trailer.
Warranty
Your trailer comes with a 12-month return to base warranty from the date of purchase. In the first instance please contact the dealer that you purchased your trailer from.

General Maintenance

It is not advisable to use a pressure washer on the trailer body as this could damage the protective sealing. A gentle wash down with a sponge and soapy water is advisable.

Some other tips:

  • Routinely grease the hubs, check/adjust bearings we would advise every 500 miles approx.
  • Check the torque of the wheel nuts after the first 100 miles and at regular intervals
  • Unbraked hubs with a grease nipple & 3/8 unf wheel nuts using an 18mm socket torque to 65nm
  • Unbraked hubs with M12 wheel bolts using an 19mm socket torque to 90nm
  • Braked hubs with M12 wheel nuts using an 19mm socket torque to 110nm
  • Tyres should be checked regularly for wear and tear. The psi of the tyre is embossed on the tyre wall.
  • If your braked trailer is not being used place chocks under the wheels rather than using the handbrake, especially over the winter months.
  • To ensure that the trailer is correctly balanced it is advisable to use a nose weight gauge.
  • The MGW is the payload + the weight of the trailer. (Maximum Gross Weight)
  • The trailer brakes are self-adjusting but will need regular maintenance they can be adjusted using 17mm and 13mm spanners.
  • We do not recommend using TFR (Traffic Film Remover)
  • Do not leave your trailer wet in closed storage as this can discolour the metals.
  • Always wash your trailer down after use from driving on salted roads or near the sea.

 

Safety Checks Before Travel

Your trailer is going out on the road and it is your responsibility to ensure that it safe to travel.
  • Ensure that the safety loop is over the towball when hitching on. Braked trailers must have the safety cable attached to the small ring on the towbar
  • Plug the electrics in and check that all lights are working properly
  • Check the jockey wheel is wound back up and is securely clamped, failure to do so may damage the A frame and jockey wheel resulting in replacement at your cost
  • Check that the rear prop stands are pushed up into the clamp and the clamp is tightly closed
  • Items inside or on the trailer are properly tied down and secured.
  • All doors, ramps, flaps and any other opening or attachment has been closed/locked
  • When you think you are ready to go, walk back around the trailer and visually check that all looks good

Electrics

UNBRAKED TRAILERS 7PIN PLUG                            
● PIN 1 YELLOW L/H indicator
● PIN 2 BLUE x2 fog
● PIN 3 WHITE x2 earth
● PIN 4 GREEN R/H indicator
● PIN 5 BROWN R/H light
● PIN 6 RED x2 brake
● PIN 7 BLACK L/H light

BRAKED TRAILERS 13PIN PLUG
● PIN 1 YELLOW L/H indicator
● PIN 2 BLUE from R/H loom fog
● PIN 3 WHITE x2 earth
● PIN 4 GREEN R/H indicator
● PIN 5 BROWN R/H light
● PIN 6 RED x2 brake
● PIN 7 BLACK L/H light
● PIN 8 PINK or BLUE from L/H loom reverse

Warranty

We will repair or replace a trailer found to have defective materials or workmanship at no charge at our discretion. Damage due to overloading, use for a purpose other than that for which the trailer is designed, modified in any way, incorrectly balanced loads, and lack of general maintenance will invalidate the warranty. Tyres are not covered by a warranty and all other trailer parts are covered under their separate manufacturers’ warranties please refer to the terms & conditions.

Polite Notice: We do not accept visitors to the workshop to look around. We are a busy factory and not a showroom. Please contact your nearest dealer to arrange a viewing of the trailers.
Quality Policy Statement
Tickners Trailers Ltd is a leading supplier of Automotive Trailers. 
Our main market is the UK although product is sometimes exported. 
Tickners Trailers organisational goals are to design and manufacture products that continually satisfy both our legal and regulatory requirements and the expectations of our customers, with respect to quality, cost, performance, safety and reliability. 
It is a mandatory condition of employment that Team members of Tickners Trailers follow procedures to maintain quality standards and contribute positively to improvement. 
Training and development of employees is the responsibility of management at all levels. 
Quality is important. In recognition of this, The Managing Director of Tickners Trailers have direct responsibility for all issues relating to our quality management system.
Here at Tickners Trailers Ltd we build everything to order in our own workshop in Norfolk. Over the years we have grown our business steadily to become an enviable brand in the trailer industry. We believe it is our down to earth attitude and easy to deal with approach that has given us the edge.
Workshop Address

34 Old Church Road,
Terrington St John, Wisbech,
Cambridgeshire,
PE14 7XA

Registered Office Address

Unit 24, Pondworld Retail Park,
Lynn Road, Wisbech,
Cambridgeshire,
PE14 7DA

Copyright © 2025 Tickners Trailers. All Rights Reserved.
Registered Company Number: 07755259